Feasibility Study on Hydropower Potential of Rataun Khola Micro-hydropower, Chyamranbesi VDC
Abstract
Rural VDCs which are still deprived from electricity can harvest their water source to meet their demand for domestic electrification, operation of grinding machine and saw mill. This can contribute to current scenario of energy crisis in Nepal. Micro-hydropower is not only a source of energy but also develops capacity of people through community participation and local governance. Chyamrangbesi VDC is one representative location of Nepal that is located very close to Kathmandu valley and still deprived of electricity from national grid. This valley has least flow of 200 LPS in summer in small valley of 65 sq km. This VDC is very much feasible for installation of several micro and smaller hydro plants that produces up to 200 kW. 300 households scattered diversely throughout the village can use electricity for domestic use and operate smaller industry for income generation such as sericulture and milk chilling center. This study is focused in observing major river system in Chyamranbesi VDC with an objective to estimate total hydropower potential and its potential use by villagers. Resources were prioritized as feasible or unfeasible on the basis of cost, topography, water rights and other issues. Baseline including socio-economic, hydrology and topography were studied. Finally, study was concluded with feasibility study and design of micro-hydropower plant of 45 kW in Rataun Khola. Chyamranbesi has good potential for hydropower generation. Energy thus generated will be able to sustain Chyamranbesi VDC for domestic electrification and can also support milling and other income generating activities. PV and wind plants can also be integrated with the system as southern belt including Sukum and Jhinge Dada.
Keywords: Energy crisis, hydropower potential, national grid
Cite this Article
Ranjan Aryal, Sabita Aryal Khanna, Ashish Shrestha, et al.Feasibility Study on Hydropower Potential of Rataun Khola Micro-hydropower, Chyamranbesi VDC. Journal of Offshore Structure and Technology. 2016; 3(2): 28–31p.
References
Shrestha HM. Cadastere of Hydropower Resources. PhD Thesis, Moscow Power Institute; 1996.
Nepal Electricity Authority. NEA Whitepaper. 2007.
Department of Hydrology and Meteorology. Hydrological Records of Nepal. 1998.
ESAP/AEPC. Format for Detailed Feasibility Studies of Prospective Micro-Hydro Projects. 2001.
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |