Construction Resources Management in Niger Delta's Coastal Environments: Hydro-Geomorphological Challenges to Sustainability
Keywords:
Construction cost, coastal environment, resources management, sustainabilityAbstract
A fundamental principle of sustainability in the built environment is the minimization of resource consumption. Resource management constitutes a key theme in the sustainability agenda, which affects the financial performance of construction projects. Builders are thus concerned with the control of materials, labour and plant. However, resource management poses specialized problems for coastal construction sites, due to their inherent hydro-geomorphological characteristics. The Niger Delta Region of Nigeria is an atypical wetland, ranking 9th in size globally, and forms the basin for discharge of the River Niger into the Atlantic Ocean. The hydrological characteristics of the Niger Delta region thus require effective measures for practically managing construction resources. Data is gathered from local builders in Bonny Island via the use of unstructured interviews as well as via a review of the grey literature. The findings uncover the technicalities inherent in managing resources and coping with the difficult terrain of the Niger Delta, and how these issues imply additional cost for project developers in coastal zones. In view of these geomorphological challenges, this study highlights the factors driving the exorbitant cost of building construction in the Niger Delta. This is to create a heightened awareness of the technical hurdles which hinder resource minimization and thus pose sustainability barriers to builders in coastal communities. The study submits that the hydro-morphological challenges of resource management in coastal areas should be increasingly analysed in the literature, as a measure to promote sustainability.References
Adrian JJ. Quantitative Methods in Construction Management. New York, NY: American
Elsevier Publishing Co., Inc.; 1973.
Antill JM, Woodhead RW. Critical Path Method in Construction Practice. 3rd Edn. New York,
NY: John Wiley and Sons, Inc.; 1982.
Arditi D. Construction Productivity Improvement. J Constr Eng Manag, ASCE. 1985 Mar;
Ill(COl): 1–14.
Bradley SP, Hax AC, Magnanti TL. Applied Mathematical Programming. Reading, Mass:
Addison-Wesley Publishing Co., Inc.; 1977.
Frein JP. Handbook of Construction Management and Organization. 2nd Edn. New York, NY:
Van Nostrand Reinhold Company, Inc.; 1980.
Perera S. Resource Sharing in Linear Construction. J Constr Eng Manag. 1983 Mar; 109(COl):
–111.
Pilcher R. Principles of Construction Management for Engineers and Managers. England:
McGraw-Hill Publishing Company Limited; 1966.
Schlick H. Discussion of "Resource Sharing in Linear Construction," by Srilal Perera. J Constr
Eng Manag, ASCE. 1984; 110(2): 295–307.
Schlick H. Schedule and Resources of Fast Track Renovation Work. Journal of the Construction
Division, ASCE. 1981 Dec; 107(C04): 559–574.
Schrage L. Linear Programming Models with Lindo. Palo Alto, Calif: The Scientific Press; 1981.
Stark RM, Rober HM Jr. Quantitative Construction Management, Uses of Linear Optimization.
New York, NY: John Wiley and Sons, Inc.; 1983.
Amadi AI. Geo-Characterization of Highway Construction Cost Drivers in the Niger Delta
Region of Nigeria. Civ Eng Res J. 2020; 10(2): 28–40. DOI: 10.19080/CERJ.2020.10.555785
URL: https://juniperpublishers.com/cerj/
Abam TKS. Regional hydrological research perspectives in the Niger Delta. Hydrol Sci J. 2001;
(1): 13–25.
Abam TKS, Osadebe CC, Omange GN. Influence of geology on pavement performance: A case
study of Shagamu-Benin City Road. Glob J Geol Sci. 2005; 3(1): 17–24.
Allen JRI. Late Quaternary Niger Delta and Adjacent areas: Sedimentary Environments and
Lithofacies. AAPG Bulletin. 1965; 49(5): 547-600.
Ngah SA, Youdeowei PO. Salinity depths in coastal aquifers of Niger Delta, Southern Nigeria.
Arch Appl Sci Res. 2013; 5(2): 222–233.
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |