Effective Project Management Through Six Sigma
Keywords:
Six Sigma, National Disaster, Floods, Process CapabilityAbstract
Six Sigma’s credibility as process and quality improvement technique is quiet established in manufacturing and service industries as this phenomenon is mature and seasoned in these industries. However, it is a new concept in the field of disaster management. This paper endeavors to set a path way for application of six sigma tools and methodologies by establishing the links to form the firm basis for their application and employment in disaster management. In the study first through literature review it is established that disaster management is composed and based on process oriented activity driven phases of mitigation, preparedness, response and recovery and that the disaster management is mostly done by the government agencies as public projects. So the projects are inherently subjected to the constraints of time, cost, scope and quality. After this; six sigma evolution, concept, methodologies and sigma levels are briefly discussed. As six sigma is a proven technique to achieve scope and excellence in quality, at the same time reducing cost and time of a project by eliminating waste, reducing variation and maintaining flow. So finally, the potential area for application and employment of six sigma tools and methodologies are recommended on the basis of established links.Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |